polarsys.chess Project Attributes



This table lists all attributes computed from plugin data, according to the quality model structure.


Name Mnemo Description Value Confidence
Activity QM_ACTIVITY The activity of the project's ecosystem, as measured on the mailing lists and configuration management system. 2.0 / 5 3 / 5 metrics
Diversity QM_DIVERSITY The diversity of the project's ecosystem, as measured on the mailing lists and configuration management system. 1.0 / 5 1 / 3 metrics
Ecosystem QM_ECOSYSTEM The sustainability of the ecosystem evolving around the project. 1.5 / 5 4 / 11 metrics
Process QM_PROCESS The maturity of the process used to run the project. 1.0 / 5 3 / 9 metrics
Eclipse Maturity QM_QUALITY The overall Maturity of the project. 1.2 / 5 7 / 28 metrics
Build and Release Management QM_REL_ENG Does the project apply best practices regarding Build and Release management? 1.0 / 5 1 / 2 metrics
Configuration Management QM_SCM The maturity of the project regarding access and usage of the configuration management system. 1.0 / 5 2 / 3 metrics

Page generated by Alambic 3.3.3-dev on Mon Apr 6 02:29:01 2020.